I.INFORMATION
1. Company's Name:
NHAT DUC COMPANY LIMITED
2. Address:
KM 234 National Road 1A, Dinh Binh Village, Camau
City, Ca mau Province. 3. Tel: (+84) 780.3684343. FAX: (+84) 780.3815419 Email: nhatduc@vnn.vn 4.Code: DL 116
5. Established year 2004
6. Export Market:
+ Japan: 30% (Abt: 180 tons/year)s.
+ EU market: 50% (Abt: 300 tons/year)
+ Others (Korea, Australia, ...): 20% (Abt: 120 tons/year)
7. Our Company have the plan to produce about 4,000 tons/year (USD30
Millions) from 2009.
II. THE FACTORY'S SURROUNDING AREA AND EQUIPMENT
1. The Factory's Surrounding Area: - Total: 18.000 square meters in area.
-
Production area : 6.000 square meters, includes of:
+ Row material receipt area: 400 square meters.
+ Pre-processing area : 1.000 square meters.
+
Processing area: 2.000 square meters.
+
Freezing area: 500 square meters.
+ Cold storage area: 2.500 square meters.
Other production area : 5.600 square meters.
2. Equipment:
NAME
QUANTITY
ORIGIN
POWER
THE YEAR OF
STARTING
PRODUCTION
Contact freezing
03
JAPAN
3.000kg/hour
2006
Air
blast freezing
01
JAPAN
250kg/hour
2006
Air
conveyor
02
JAPAN
1.000
2007
Compressor
10
JAPAN
2006
Flake ice machine
02
JAPAN
30
tons/day
2007
Water chilling Machine
01
JAPAN
15m3/hour
2007
Cooking conveyor machine
01
DANISH
500kg/hour
2007
Bar
ice maker
01
VIETNAM
800
bar/day
2007
Cold storage
03
JAPAN
4.000tons
2008
3.Support system:
3.1 Source of water for production area:
a. Source of using water: Public, well water:
quantity: 1, depth
256 m.
b. Quality safe measure of supplying water for
production area (include ice producing area).
Deposit sediment system: Yes , No , Other
method...
Water tank: quantity: 2, Total of reserve
capacity: 100m3/tank.
Water treating system: Chlorine
,
ultraviolet lamp ,
others... 3.2 Source of ice: Factory's producing: Bar ice
Total power: 37 tons/day.
Flake ice
Total
power: 30 tons/day.
Other buying: Bar ice
,
Total power:...tons/day.
Wave ice
,
Total power: ...tons/day. 3.3 Waste matter treating system:
+ Waste water: Describe the sum up of sullage pit and waste
water treating system: Waste water run from clear area to dirty
area partitioned off solid waste by net, this solid waste is
gathered into gas - hole and after that running out sewerage.
+ Solid waste: (preservation method, transport, treating...) is
hired outside. 3.4 Rest-room (using for production area)
+ Quantity: 25 rooms. 3.5 Labour force:
+ Total : 810 persons, in there:
+ Working long-term : 810 persons.
+ Raw material receipt area : 16 persons.
+ Pre-processing area : 400persons.
+ Processing area : 300 persons.
+ Freezing, packing area : 36 persons.
+ Other area : 64 persons. 3.6 Decontamination systems of insect and animal:
+ Insect: Using the sterilizing lamps
+ Animal: Using traps 3.7 Hygienic conditions:
+ Hygienic frequency: As Regulation.
+ Hygienic worker : 10 persons.
+ Includes of: Factory's workers,
Outsourcing. 3.8 List of chemical, additive and sterilizers: